{"id":39342,"date":"2026-11-18T10:29:17","date_gmt":"2026-11-18T10:29:17","guid":{"rendered":"https:\/\/www.delongtop.com\/?p=39342"},"modified":"2026-11-18T10:29:17","modified_gmt":"2026-11-18T10:29:17","slug":"battery-storage-installation-checklist","status":"publish","type":"post","link":"https:\/\/www.delongtop.com\/fr\/battery-storage-installation-checklist\/","title":{"rendered":"Battery Storage Installation Checklist: Wiring &#038; BMS Communication"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">In many energy storage installations, unexpected delays and extra costs do not happen during equipment mounting or physical wiring. Instead, they happen during the final BMS communication setup. An unverified pinout, an incorrect DIP switch setting, or a mismatched baud rate can prevent the inverter from reading battery data, forcing technicians to make a costly return trip to the site for troubleshooting.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For installation teams, time is profit. This checklist cuts out the fluff and focuses strictly on practical field steps, from cable selection to system startup. It is designed to help engineering teams commission systems efficiently, avoid unnecessary rework, and deliver projects on schedule.<\/span><\/p>\n<h2><span style=\"color: #339966;\"><b>Pre-Installation Quick Checks<\/b><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Before starting electrical connections and BMS communication setup, check the following installation conditions to rule out potential problems that could affect system operation.<\/span><\/p>\n<ul>\n<li><b> Physical Environment and Grounding<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Verify that the wall or foundation has sufficient load-bearing capacity. Make sure the cabinet&#8217;s cable entry points are properly waterproofed. Complete routine protective earth checks to reduce the risk of electrical leakage and interference. Please note that you must never perform high-voltage Megger insulation testing while the BMS communication cables are connected.<\/span><\/p>\n<ul>\n<li><b> Equipment Compatibility and Protocols<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Before starting work, confirm that the battery is fully compatible with the specified inverter, such as Deye, Growatt, Victron, or SMA, as well as its CAN or RS485 protocol. Always request exact pinout diagrams and DIP switch instructions for that specific inverter from the battery manufacturer in advance. Avoid trial and error on site.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Once the physical environment and protocol details are verified, the real challenge begins. The following four core steps will determine whether your system powers up successfully on the first try.<\/span><\/p>\n<h2><span style=\"color: #339966;\"><b>Cable Selection and Wiring Practices to Minimize EMI<\/b><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Large-capacity battery modules are rarely plug-and-play. On-site installations typically involve running high-current DC busbars alongside communication wiring. Given the noisy electrical environment, follow these wiring rules to ensure reliable BMS communication:<\/span><\/p>\n<ul>\n<li><b> Use Shielded Cables<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">To minimize data loss caused by electromagnetic interference, we strongly recommend using CAT5E or higher shielded twisted-pair cables as your team&#8217;s standard. Avoid<\/span><span style=\"font-weight: 400;\"> standard<\/span><span style=\"font-weight: 400;\"> unshielded cables. While unshielded cables might work over very short distances, they are a frequent source of dropped connections and system faults in noisy environments.<\/span><\/p>\n<ul>\n<li><b> Single-Ended Grounding<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Connect the cable shield to the ground at the inverter end only, leaving the battery end floating and unconnected. This prevents ground-loop interference caused by electrical potential differences between the two devices, securing the physical communication layer.<\/span><\/p>\n<ul>\n<li><b> Keep Power and Comm Cables Separate<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Maintain physical separation between low-voltage communication cables and high-voltage DC power lines. Never bundle them tightly together in the same cable tray. High-current busbars generate strong magnetic fields that interfere with BMS signals. Additionally, always tighten power terminals to the specified torque to prevent overheating.<\/span><\/p>\n<h2><span style=\"color: #339966;\"><b>DIP Switch and Address Setup for Parallel Systems\u00a0<\/b><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Commercial and large residential projects often require multiple batteries connected in parallel, such as 15 modules for a 240kWh battery bank. In standard daisy-chain topologies, the inverter relies entirely on the battery DIP switches to identify the battery bank.<\/span><\/p>\n<ul>\n<li><b> Configure the Master Battery<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Designate the first battery as the Master. Its communication port connects directly to the inverter, allowing it to manage external communication for the entire cluster.<\/span><\/p>\n<ul>\n<li><b> Assign Unique Slave Addresses<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Configure batteries 2 through 15 as Slaves. Set their DIP switches sequentially according to the manufacturer&#8217;s binary rules. Every battery must have a unique address. Duplicate addresses create conflicts and prevent the inverter from recognizing the modules.<\/span><\/p>\n<ul>\n<li><b> Daisy-Chain Topology &amp; Terminal Resistors<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Connect the communication cables between modules in a daisy-chain series. Crucially, you must install a 120-ohm termination resistor in the empty port of the final 15th battery, or enable it via the DIP switch. This action does more than just close the circuit. It matches the bus impedance, suppressing high-frequency signal reflections that cause handshake failures.<\/span><\/p>\n<ul>\n<li><b> Physical Impedance Check (Optional)<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">For advanced troubleshooting while the system is completely powered off, use a multimeter to measure the static resistance across the communication bus. If the 120-ohm resistors are correctly active at both ends, the equivalent resistance should read roughly 60 ohms, though internal circuitry may cause slight variations. This quick test helps identify broken cables, loose connections, or missing resistors.<\/span><\/p>\n<h2><span style=\"color: #339966;\"><b>Cross-Check BMS and Inverter Pinouts\u00a0<\/b><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Although lithium batteries and inverters from different brands use RJ45 ports, their internal pin assignments are rarely identical. Never assume a standard 1-to-8 straight-through Ethernet cable will work just because the plugs fit. Blindly connecting devices can cause handshake failures or even burn out the communication ports.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Before crimping, always compare the pinout diagrams in both manuals. Here are common industry examples and wiring guidelines:<\/span><\/p>\n<\/p>\n<div class=\"table-1\">\n<table width=\"100%\">\n<thead>\n<tr>\n<th align=\"left\"><b>Protocol<\/b><\/th>\n<th align=\"left\"><b>Inverter Pin Example<\/b><\/th>\n<th align=\"left\"><b>Battery BMS Pin Example<\/b><\/th>\n<th align=\"left\"><b>On-Site Wiring Guidelines<\/b><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td align=\"left\"><span style=\"font-weight: 400;\">CAN<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Pin 4 CAN-H, Pin 5 CAN-L<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Pin 4 CAN-H, Pin 5 CAN-L<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Common, but not universal. Check both manuals to confirm signal alignment and see if a custom crossover cable is needed.<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><span style=\"font-weight: 400;\">RS485<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Pin 1 (A), Pin 2 (B)<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Pin 7 (A), Pin 8 (B)<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Pin assignments vary wildly by brand. Verify the exact A and B connections and make sure baud rates match.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\n<h2><span style=\"color: #339966;\"><b>Follow the Correct Startup Sequence and Verify Data<\/b><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">An incorrect power-on sequence can trigger a BMS protection lock due to inrush currents, or cause the inverter to freeze and throw errors. While high-voltage and low-voltage systems have minor pre-charge differences, to prevent faults caused by blind power-ups, this sequence serves as a universal foolproof reference:<\/span><\/p>\n<ul>\n<li><b> Close the Battery Breaker<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Confirm that all battery modules boot up normally with stable indicators and no fault alarms.<\/span><\/p>\n<ul>\n<li><b> Turn on the Inverter DC Switch<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Wait for the inverter to finish its self-check and fully light up the display.<\/span><\/p>\n<ul>\n<li><b> Match the Protocol<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Open the inverter&#8217;s settings menu, select the correct lithium battery protocol code, and ensure the RS485 baud rate matches the battery.<\/span><\/p>\n<ul>\n<li><b> Verify Core BMS Data<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">A fault-free home screen is not enough. Go to the inverter&#8217;s battery information page and confirm it accurately reads the State of Charge, Charge Current Limit, and Discharge Current Limit. If supported, checking the State of Health provides further proof that the data is parsing correctly.<\/span><\/p>\n<ul>\n<li><b> Close AC and DC Loads<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Only after confirming communication is working properly should you close the grid and load breakers for testing.<\/span><\/p>\n<h2><span style=\"color: #339966;\"><b>Quick Troubleshooting Guide for BMS Communication Faults\u00a0<\/b><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">If the inverter reports a communication fault after startup, use these common symptoms to identify the cause and prioritize your next steps:<\/span><\/p>\n<ul>\n<li><b> Inverter cannot detect battery, or charge status stays at 0%<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">First, verify the correct lithium battery protocol is selected in the inverter. Next, cross-check the CAN or RS485 pinouts. Finally, ensure the Master battery&#8217;s DIP switch is correctly set as the primary unit.<\/span><\/p>\n<ul>\n<li><b> Some Slave units disconnect or are not detected<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Check all parallel battery DIP switches for duplicate addresses. Inspect the daisy-chain cables to ensure correct sequencing. Finally, confirm the 120-ohm termination resistor is active on the very last battery.<\/span><\/p>\n<ul>\n<li><b> Intermittent dropouts or faults under heavy loads<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This usually indicates electromagnetic interference. Check if unshielded cables were used by mistake. Ensure the cable shield is grounded at the inverter end only. Verify comm cables are not bundled tightly with high-voltage DC busbars.<\/span><\/p>\n<ul>\n<li><b> Comms are established, but system will not charge or discharge<\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Check the current limits in the inverter menu. If both show 0A, the BMS has likely triggered a protection lock such as cell overvoltage or undervoltage. You will need the manufacturer&#8217;s PC software to read the exact alarm logs.\u00a0<\/span><\/p>\n<h2><span style=\"color: #339966;\"><b>One-Page Execution Checklist<\/b><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">We recommend printing this checklist for use on-site. The project supervisor should verify each item during commissioning. Note that this list is based on industry best practices. If a manufacturer&#8217;s manual specifies different requirements, always follow their exact instructions.<\/span><\/p>\n<\/p>\n<div class=\"table-1\">\n<table width=\"100%\">\n<thead>\n<tr>\n<th align=\"left\"><b>Phase<\/b><\/th>\n<th align=\"left\"><b>Core Checklist Item (No Compromises)<\/b><\/th>\n<th align=\"left\"><b>Check (\u2713)<\/b><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td align=\"left\"><b>Cabling<\/b><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">CAT5E or higher shielded cables used; ordinary unshielded cables rejected.<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">[ \u00a0 ]<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><b>Grounding<\/b><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Cable shield grounded at the inverter end only; battery end left floating.<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">[ \u00a0 ]<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><b>Addressing<\/b><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Master and Slave DIP addresses are unique with no duplicates.<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">[ \u00a0 ]<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><b>Termination<\/b><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">A 120-ohm termination resistor is installed or enabled on the final battery.<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">[ \u00a0 ]<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><b>Pinouts<\/b><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Pinouts cross-checked across manuals; CAN or RS485 signals match perfectly.<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">[ \u00a0 ]<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><b>Startup<\/b><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Sequence strictly followed: wake up batteries first, then turn on inverter DC switch.<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">[ \u00a0 ]<\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><b>Validation<\/b><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">Inverter successfully reads battery data and current limits with no active faults.<\/span><\/td>\n<td align=\"left\"><span style=\"font-weight: 400;\">[ \u00a0 ]<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\n<h2><span style=\"color: #339966;\"><b>BMS Communication Wiring &amp; Compatibility FAQ\u00a0<\/b><\/span><\/h2>\n<p><b>Why can I not just use a standard Ethernet cable if both devices have RJ45 ports?<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The connectors look identical, but the internal wiring is often different. A standard Ethernet cable is wired straight-through from Pin 1 to 8. However, an inverter might assign communication signals to Pins 1 and 2, while the battery uses Pins 7 and 8. Plugging them in blindly will cause communication failure and can even damage the ports. Always check the pinout diagrams first.<\/span><\/p>\n<p><b>Will an unshielded cable cause an immediate communication error?<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Not always. It might work initially, but it leaves your system vulnerable. Battery storage systems generate high-frequency electromagnetic interference. Unshielded cables pick up this noise, resulting in dropped data packets. Under heavy loads, this frequently causes the inverter to report a communication fault and cut power.<\/span><\/p>\n<p><b>Can I use CAN instead of RS485 for communication?<\/b><\/p>\n<p><span style=\"font-weight: 400;\">No, they cannot be swapped freely because they use entirely different electrical interfaces and mechanisms. You must use the protocol supported by both the inverter and battery firmware. If both are supported, CAN is generally recommended because its pin assignments are more standardized across the industry, making wiring easier. If you must use RS485, carefully verify the baud rates and wire mapping.\u00a0<\/span><\/p>\n<h2><span style=\"color: #339966;\"><b>Conclusion: Protect Your Margins with Standardized Processes\u00a0<\/b><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">In storage installation projects, profitability depends heavily on field efficiency. Every successful BMS handshake prevents a costly secondary truck roll for troubleshooting. By standardizing your wiring, addressing, and startup procedures, your team can eliminate avoidable errors. We highly recommend using this checklist as your team&#8217;s standard operating procedure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Note on Compatibility: Delong energy storage systems natively support both CAN and RS485 protocols and are compatible with mainstream inverter brands like Deye, Victron, Growatt, and SMA. We provide detailed pinout diagrams and protocol docs to help your team match systems quickly and avoid unnecessary troubleshooting. [Verify your inverter compatibility and get a custom project solution]<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>In many energy storage installations, unexpected delays and extra costs do not happen during equipment mounting or physical wiring. Instead, they happen during  [&#8230;]<\/p>","protected":false},"author":4,"featured_media":39344,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[164],"tags":[],"class_list":["post-39342","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Battery Storage Installation Checklist: Wiring &amp; BMS Communication - Delong Energy<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.delongtop.com\/fr\/battery-storage-installation-checklist\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Battery Storage Installation Checklist: Wiring &amp; BMS Communication - Delong Energy\" \/>\n<meta property=\"og:description\" content=\"In many energy storage installations, unexpected delays and extra costs do not happen during equipment mounting or physical wiring. Instead, they happen during [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.delongtop.com\/fr\/battery-storage-installation-checklist\/\" \/>\n<meta property=\"og:site_name\" content=\"Delong Energy\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-18T10:29:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Delong\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Delong\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/\",\"url\":\"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/\",\"name\":\"Battery Storage Installation Checklist: Wiring & BMS Communication - Delong Energy\",\"isPartOf\":{\"@id\":\"https:\/\/www.delongtop.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg?fit=800%2C533&ssl=1\",\"datePublished\":\"2026-11-18T10:29:17+00:00\",\"author\":{\"@id\":\"https:\/\/www.delongtop.com\/#\/schema\/person\/a2b36b93a21fe0bafd86071ec13e827d\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg?fit=800%2C533&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg?fit=800%2C533&ssl=1\",\"width\":800,\"height\":533,\"caption\":\"Battery Storage Installation Checklist\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.delongtop.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Battery Storage Installation Checklist: Wiring &#038; BMS Communication\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.delongtop.com\/#website\",\"url\":\"https:\/\/www.delongtop.com\/\",\"name\":\"Delong Energy\",\"description\":\"Lithium Ion Battery Manufacturer &amp; Factory In China\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.delongtop.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.delongtop.com\/#\/schema\/person\/a2b36b93a21fe0bafd86071ec13e827d\",\"name\":\"Delong\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.delongtop.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e82b02db42d70c5ff8bcfad9905696cdcdff156ca7fd370090f324379c648677?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e82b02db42d70c5ff8bcfad9905696cdcdff156ca7fd370090f324379c648677?s=96&d=mm&r=g\",\"caption\":\"Delong\"},\"url\":\"https:\/\/www.delongtop.com\/fr\/author\/hzj\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Battery Storage Installation Checklist: Wiring & BMS Communication - Delong Energy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.delongtop.com\/fr\/battery-storage-installation-checklist\/","og_locale":"fr_FR","og_type":"article","og_title":"Battery Storage Installation Checklist: Wiring & BMS Communication - Delong Energy","og_description":"In many energy storage installations, unexpected delays and extra costs do not happen during equipment mounting or physical wiring. Instead, they happen during [...]","og_url":"https:\/\/www.delongtop.com\/fr\/battery-storage-installation-checklist\/","og_site_name":"Delong Energy","article_published_time":"2026-11-18T10:29:17+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg","type":"image\/jpeg"}],"author":"Delong","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Delong","Dur\u00e9e de lecture estim\u00e9e":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/","url":"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/","name":"Battery Storage Installation Checklist: Wiring & BMS Communication - Delong Energy","isPartOf":{"@id":"https:\/\/www.delongtop.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#primaryimage"},"image":{"@id":"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg?fit=800%2C533&ssl=1","datePublished":"2026-11-18T10:29:17+00:00","author":{"@id":"https:\/\/www.delongtop.com\/#\/schema\/person\/a2b36b93a21fe0bafd86071ec13e827d"},"breadcrumb":{"@id":"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#primaryimage","url":"https:\/\/i0.wp.com\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg?fit=800%2C533&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg?fit=800%2C533&ssl=1","width":800,"height":533,"caption":"Battery Storage Installation Checklist"},{"@type":"BreadcrumbList","@id":"https:\/\/www.delongtop.com\/battery-storage-installation-checklist\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.delongtop.com\/"},{"@type":"ListItem","position":2,"name":"Battery Storage Installation Checklist: Wiring &#038; BMS Communication"}]},{"@type":"WebSite","@id":"https:\/\/www.delongtop.com\/#website","url":"https:\/\/www.delongtop.com\/","name":"Delong Energy","description":"Lithium Ion Battery Manufacturer &amp; Factory In China","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.delongtop.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/www.delongtop.com\/#\/schema\/person\/a2b36b93a21fe0bafd86071ec13e827d","name":"Delong","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.delongtop.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e82b02db42d70c5ff8bcfad9905696cdcdff156ca7fd370090f324379c648677?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e82b02db42d70c5ff8bcfad9905696cdcdff156ca7fd370090f324379c648677?s=96&d=mm&r=g","caption":"Delong"},"url":"https:\/\/www.delongtop.com\/fr\/author\/hzj\/"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.delongtop.com\/wp-content\/uploads\/2026\/11\/Battery-Storage-Installation-Checklist-8.jpg?fit=800%2C533&ssl=1","_links":{"self":[{"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/posts\/39342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/comments?post=39342"}],"version-history":[{"count":2,"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/posts\/39342\/revisions"}],"predecessor-version":[{"id":39348,"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/posts\/39342\/revisions\/39348"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/media\/39344"}],"wp:attachment":[{"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/media?parent=39342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/categories?post=39342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.delongtop.com\/fr\/wp-json\/wp\/v2\/tags?post=39342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}